CARROG STATION PROJECT
LIST
The comprehensive list below
will give you a good idea of the amount of work still to be done here. The Friends of
Carrog group has dwindled down to a dedicated few as most have gone on to other projects
elsewhere on the railway, so we are grateful for any willing hands to help undertake these
necessary tasks.There is something for everyone- skilled or not!
1. General Maintenance. a) Painting b) Window cleaning c) Lamps d) Whiteline repainting e) Road and car park maintenance f) Gutters g) Paths h) Fences i) Hedge cutting j) Weed killing k) Periodic electrical testing, maintenance, seasonal modifications and santa setups etc. 2. Signal Box.a) Clean brickwork b) Glazing and window repairs c) Wood cover for lamp switch and telephone. d) Painting (major item-one years work) 3. Waiting Rooma) Clean brickwork b) Lead flashing repair c) Fireplace d) Skirting e) Tiling f) Painting 4. Platform 1&2a) Point up brickwork b) Build sleeper crossings 5. Platform 2 patha) Dechair sleepers, complete weir path. b) Drains improvements c) Surface 6. Main Entrancea) Replace paving at porch 7. Spear Fencinga) Make up panels. b) Install east end platform 1 c) Install at toilet block 8. Electricala) Complete enclosure at 5199 coach b) ditto weighbridge 9. Special events Santas, Transport extrav. etc.a) Put up b) Take down 10. Toilet block/bin areaa) Support existing brick retaining wall with bull head rail set in concrete and tension bar. b) Rebuild dry stone walls. 11. Retaining wall at Platform 2.a) Stabilise bank and rebuild wall (after wood signal post installation) 12. Signal posts.a) Dry store and conserve wood signal posts. b) Determine design requirements for 6 individual posts. c) Reshape/finish posts d) Treat/paint posts. e) Prepare steel supports and fit to post. f ) Install. 13. Sidings.a) Sleeper buffer stops b) Loading gauge c) Telegraph poles d) Ballast track 14. Car Park & entrance road.a) Determine and install drainage b) Resurface c) Landscape d) Dispose of unwanted items and rubbish. e) Remove crane f ) Transfer of Weston Rhyn box to Corwen 15. Gardening a) Spring planting. b) Autumn planting c) Pruning d) Weeding 16. Urinala) Install ½ roof over urinal b) Fit slate backing and divisions to wall c) Render walls d) Tile walls e) Water pipe to outside tap f) Manufacture/obtain internal lamp and install g) Install adjust dress and gents signs 17. Main Buildingsa) Roof repairs b) Replace plastic gutters with CI. c) Paint d) Maintenance e) Re-glaze cracked windows f ) Complete repairs to fire places g) Attend to bird nest holes etc 18. Toilet Blocka) Finish internal painting & decorating b) Rearrange internal fitments, drier etc |