This shows the completed Judy platform topsides in the fabrication yard of AMEC at Wallsend. It is supported on jacks waiting to be loaded onto the barge for transporting to its location in the North Sea. It was then hoisted onto the Jacket by the floating heavy lift vessel M7000.